Monte Circle Office Park
Monte Circle Office Park
More centres — soon
live · auditable
05 / 13

Utility audits

Monte Circle Office Park · 23 bulk · 24 submeters

live · synced 21h ago
Auto-narrative · utilitiesgenerated 21h ago

Across CoJ, Eskom and Rand Water accounts the audit layer recovered R143 000 this cycle and avoided R143 000 in overpayment. The largest single item is a City-of-Joburg tariff-band misalignment on bulk meter MM-01 dating back to August 2025; an Eskom demand penalty on MM-12 and a submeter pass-through over-recovery on SM-04 round out the flagged set.

⚡ Recommended action

Lodge the MM-01 tariff correction with CoJ for the back-period; raise the MM-12 demand re-rating with Eskom and credit the SM-04 tenant on next reconciliation.

Recoverable positionR143 000cycle 2026-04 · MTD
Avoided overpaymentR143 000CoJ · Eskom · Rand Water
Pillar posture7 / 10flagged across 10 utility pillars

Meter grid

47 meters · click any to inspect
recover
liability
investigate
clean
Filter · verdict
Bulk · 23
Submeter · 24

By supplier

recoverable position + flags per lodgement target

City of JoburgR124 8005 flagged · 33 meters
EskomR18 2001 flagged · 7 meters
Rand WaterR00 flagged · 7 meters

Flagged meters

6 of 47 meters carry a finding · click any meter in the grid to inspect

  • MM-01RecoverTariff & demand

    Bulk meter MM-01 on CoJ commercial tariff. Tariff band misalignment from August 2025 — billed on prior demand band despite step-down threshold breach. Back-correction across 8 cycles = R124,800.

    +R124 800
  • MM-04LiabilityVAT / surcharge

    CoJ surcharge (electricity levy) applied at the legacy rate after the 2025-09 gazette reduction. Two cycles over-billed; refund position R5,800 owed back to landlord.

    R5 800
  • MM-12RecoverDemand penalty

    Eskom Megaflex demand-penalty applied above contracted notified-max-demand for 4 consecutive cycles. Trailing utilisation never breached threshold; penalty back-correction R18,200.

    +R18 200
  • SM-04LiabilityTenant pass-through

    Submeter SM-04 tenant pass-through R/kWh exceeded landlord cost across 5 cycles — over-recovery of R12,400 owed back to the tenant on next reconciliation.

    R12 400
  • SM-12InvestigateSubmeter attribution

    Submeter SM-12 has estimated reads for 6 consecutive cycles — actuals diverge from estimate at last manual capture. Variance shape suggests under-reading. Investigate.

    +R0
  • SM-19InvestigateReactive power

    Submeter SM-19 trailing power factor 0.91 across 3 cycles — below the 0.96 threshold. PF correction not yet billed; flag for engineer review before lodgement.

    +R0

Pillar posture

7 of 10 pillars flagged · 10 audit dimensions, extensible

  • Tariff & demandsupplier tariff bands · demand thresholds
    R124 8001/1 flagged
  • Submeter attributionsubmeter → unit allocation · estimated reads
    R01/1 flagged
  • Common-area allocationGLA-weighted CAM utility share
    R01/1 flagged
  • Utility billing accuracysupplier bill vs meter read
    clean0/23 flagged
  • Tenant pass-throughsubmeter R/kWh markup vs supplier R/kWh
    − R12 4001/1 flagged
  • Demand penaltypeak / off-peak / max demand
    R18 2001/1 flagged
  • Capacity chargekVA capacity vs actual utilisation
    clean0/23 flagged
  • Reactive powerpower factor penalties
    R01/1 flagged
  • Water step-tariffRand Water step thresholds
    clean0/23 flagged
  • VAT / surchargesupplier surcharge passes
    − R5 8001/1 flagged
Audit dimensions10 default · extensible
Re-runsevery billing cycle · 24/7