Investor briefing · April 2026

For the April 2026 cycle the audit identified a gross recoverable position of R515,045 across thirteen lease and utility items, spanning under-applied escalations, turnover rent under-billings, OpEx pro-rata shortfalls, municipal rates pass-throughs, and bulk tariff corrections, against which three identified liabilities totalling R27,045 are to be settled, leaving a net recoverable position of R488,000 that will be invoiced or credited in the next billing run. NOI is supported by this net uplift, though three utility items — an estimated-read discrepancy on submeter SM-12, a power-factor condition on SM-19, and a minor common-area allocation drift in Block C — remain under active investigation and carry no assigned value until engineer review is complete. The portfolio's clean audit rows confirm that escalation and pass-through compliance is functioning correctly on at least two tenancies, which is consistent with an otherwise well-occupied rent roll; no vacancy-driven income loss or arrears exceptions were raised by the audit engine in this cycle, meaning the arrears and occupancy positions are stable and carry no outstanding flags requiring investor attention at this time. Management's focus for the coming cycle is lodgement of the R488,000 net recovery, resolution of the three investigate items, and correction of the AfriSky GLA overstatement to remove the R8,845 per month over-billing liability before it escalates further.

  • audit_row · 258f5aac
  • audit_row · 255e82c7
  • audit_row · b9f53320
  • audit_row · 04d3f072
  • audit_row · 648fc5b7
  • audit_row · 46d15204
  • audit_row · bf4d8e5c
  • audit_row · 86155959
  • audit_row · fce07d2b
  • audit_row · 5b8d7661
  • audit_row · 7336b01f
  • audit_row · 615f545a
  • audit_row · cf2764b8
  • audit_row · a3ab0859
  • audit_row · e2da0d20
  • audit_row · 02d4af0f
  • audit_row · b41fd764
  • audit_row · e54ae6b9
  • audit_row · 163d9e63
  • audit_row · 935ac52d
  • audit_row · 37dc046f
Recovered MTDR487 200audit-driven · this cycle
Avoided overpaymentR143 000MM-01 · CoJ back-correction
NOI · monthlyR5 842 000+6.3% YoY
Occupancy96.6%+0.4pp QoQ

Active actions

Pulled from the latest Manco · 5 open · meeting held 125d ago

5 open
  • Draft AfriSky proposal · Block C 4A · R150/sqm · server-room move includedlinked → JC-RENEWAL-2B
    due 02 May
  • Push CoJ lodgement to municipality once signedlinked → UTIL-AUD-MM01 · R124,800 recovery
    due 02 May
  • Sign off CoJ tariff back-correction lodgement in audit consolelinked → UTIL-AUD-MM01
    due 03 May
  • Approve JC-1850 — water anomaly investigation Block Clinked → JC-1850 · auto-dispatch on approval
    due 03 May
  • Tenant-by-tenant renewal strategy memo · 5 at-risk tenantslinked → RENEWAL-PIPE-26
    due 16 May
Accessread-only · magic-link auth (Phase 5)
Refreshdaily 06:00 SAST
Audienceco-investors · absent shareholders